9:30 AM |
11:00 AM | Session 1A: Improving Reliability, Performance and Capacity through Inspecting and Modeling Maintenance Room: 14
Click here for details.This session will review facility reliability, predicting unit capacity and share best practices in performance and maintenance with temporary power as well as the use of remote digital video inspection technology.
Speakers: |
Improving Facility Reliability By Managing Plant Water Balance Abstract
Steve Reinhart, Operations Manager, Ethos Energy Group / Gila River Power Station
|
|
Predicting Unit Capacity and Identifying Limiting Operating Factors with First Principles Thermodynamic Models Abstract
|
|
Inspect before you replace. Capital expense reduction utilizing remote digital video inspection technology Abstract
|
|
1:00 PM |
2:30 PM | Session 1B: Don't Get Left in the Dark - Outage Management Room: 14
Click here for details.Outage management, part of plant maintenance, is of key importance in today’s world of tightened pressure in energy Markets. Building a good program, sustaining it, and learning from each experience is vital. It is a journey you are never finished with.
Moderator/Chair: |
Joe VonDerHaar, Director, Plant Operations Spurlock, East Kentucky Power Cooperative Inc. [EKPC]
|
Co-Chair: |
|
Speakers: |
Revisiting Planned Outage Execution Practices Abstract
|
|
Project Management Skills Abstract
|
|
Spurlock Station’s Maintenance Journey “Reactive to Proactive” Abstract
Kyle Shadoan, Maintenance Manager, East Kentucky Power Cooperative Inc. [EKPC]
|
|
1:00 PM |
2:30 PM | Session 1BB: Are you Operating at Peak Performance? - Combined Cycle Enhancements You Need to Know About Room: 11
Click here for details.Learn about new enhancements with combustion turbines/combined cycle machines. See what performance upgrades do for reliability, flexibility & improved machine performance.
Chair: |
|
Co-Chair: |
Rob Broglio, Sr. Sales Manager, Doosan Power Services America
|
Speakers: |
Mitsubishi Hitachi Expanded range of Industrial Gas Turbines Abstract
|
|
Plant Optimization Studies of existing Combined Cycle Assets with Performance Upgrades Packages Abstract
RuthAnn Rawlings, Product Manger, 7F Gas Turbine Platform, PSM - An Alstom Company
|
|
2:45 PM |
4:15 PM | Session 1C: Improving Boiler Performance and Longevity Room: 14
Click here for details.This session will focus on improving boiler performance and longevity. The first paper will look at the effects of load cycling on boiler pressure parts. The second paper will look at methods to extend tube life in severe operating conditions. The following paper will address boiler improved MATS compliance by reducing boiler air in-leakage. The final paper will address at improving heat rate improvement using sootblower optimization.
Moderator/Chair: |
|
Co-Chair: |
|
Speakers: |
Metallurgical Aspects of Load Cycling on Boiler Pressure Parts Abstract
|
|
Extending the lifetime of boiler tubes under severe conditions with advanced coatings in waste and coal-fired power plants. Abstract
Tim Batton, Director of Marketing, Eutectic Corporation
|
|
Controlling the Cost of MATS Compliance via Air In-Leakage Reduction Abstract
|
|
Operational Flexibility and Heat Rate Improvements through Sootblowing Optimization at KCP&L Abstract
|
|
Follow Us: